Redi-Rock Case Studies – Clifford Chambers
Redi-Rock stops repeat flooding
The Solution
Construct Corporation recently completed a flood defence solution at Clifford Mill in Stratford – Upon – Avon, which has been declared as a complete success by everyone involved.
The 140-metre flood defence wall was built from 543 of our double faced blocks, and will protect the old mill and offices that over the last two years has flooded several times.
Constructs large block modular system, Redi-Rock, was installed in record time and created an aesthetically pleasing outlook to the residents and businesses.
Stratford upon Avon’s MP John Maple was very impressed with the installation, which delivered on all aspects of the project brief
|